Saturday, September 24, 2016

Foundation Forming and Concrete Pour

Getting an inspection from the structural engineer.
Checking all the rebar.
Everything looks good, can pour concrete.
We are set to go looking at the front right.
Looking at the front left.
Starting the pour.
Interesting to watch.
Trucks on the road out front.
Have a concrete pumper pumping concrete.
Front wall. 
John and his sister Joy.
Concrete coming out of the tube.
All the forms off looking north.
Looking south.
Getting ready to start forming for the next steps.
What a tangle of weeping tile!
But they were successful in getting weeping tile
around the foundation and covered with stone.
Friday night after the work is done.
Will be pouring the footings for the front deck posts.
Pouring the crawl space floor. The concrete truck
has its own pump.
Did had some rain but everyone says no problem. 
Like painting yourself into a corner. 
The corner turned out well.
Little rain water on top but done.