Spring 2017 After a Long Winter's Nap

 
Our first job was to finish backfilling around the foundation.
The mountain of sand is gone. 
Moved a lot of sand to the back leveling out the yard. 
Second job was emptying all the straw that covered the footings
along with the sand that blew in during the winter. 
80 some bales plus lots of loose straw in garbage bags
that was carried out.
All cleaned and ready for the framers. 
First floor joists. 
These guys work fast and do quality work. 
Our new "dance floor" 
First sunset of the season from the job site. 
Walls are going up fast. 
Front entry and two large sliders will fill the holes. 
View from Joy's level dining area.
Nice and level ready for the next floor.
Our floor has arrived. 
Finished taking the bracing out of the crawl space. 
If you are less that 68" tall this space is for you. 
But will house utilities and storage.