Started some backfilling of the south side.
And east side from the sand pile in the back yard.
We built the window frames for the walkout basement.
These were placed between the forms for the concrete walls.
Nice "sandwich" for the windows.
More placements of window frames.
Looking west ready for concrete pour.
Looking east.
Pouring concrete with a long pump.
Pouring concrete.
Pouring concrete.
No comments:
Post a Comment